From the early pioneers on the Snowy Mountains Hydroelectric Scheme, to our leaders and innovators of today, our people make us who we are.
Through our network of global specialists and by collaborating with local partners, we connect you with the best teams and capabilities to deliver highly innovative and sustainable solutions.
As an organisation we are continually evaluating ways we can better provide a safe, flexible, inclusive and respectful workplace for our people and clients.
People are at the heart of our organisation, we strive to create a flexible, diverse and inclusive environment that enables our people to thrive to their fullest potential.
Explore career opportunitiesSierra Leone
As part of the scope, SMEC will unpack an earlier feasibility study carried out in March 1981 under the Mano River Union (MRU). The earlier study proposed a 65m high embankment dam approximately 60 km from the mouth of the river where it empties into the Atlantic Ocean.
Key deliverables for the project include production of a prefeasibility report containing:
It is anticipated that the entire production of the project can be absorbed by the existing electricity grids of Sierra Leone and Liberia, which would significantly bridge part of the energy deficit of the two countries.
The Tbilisi Development Fund has engaged SMEC to develop the Dighomi floodplain rehabilitation strategy. The Dighomi Floodplain is an area of special conservation interest, which includes riparian forest, protected Otter habitat and other unique flora and fauna ecosystems that have been assessed as critical by the International Finance Corporate Performance Standard.
SMEC has been contracted by Electricidade De Timor-Leste (EDTL) for the role of Project Supervision Consultants for the Power Distribution Modernisation Project in Timor-Leste. Supported by a loan from the Asian Development Bank (ADB), the project aims to assist EDTL in modernising the country’s power distribution system and strengthening institutional capacity.
Geotechnics will play a key role in helping our society achieve a safe, prosperous and sustainable future. Recent droughts have resulted in a need for more dam design and construction. Recent rainfall has resulted in extensive slop failures impacting our roads, rail and urban infrastructure. Energy transformation is driving large scale solar, wind and pumped hydro construction. These projects will all require geotechnical input to future plan for our communities.
Richard Parsons, one of SMEC’s key leaders in Social Value and Engagement is presenting on their technical paper ‘Considering Social Impact Assessment from a public interest perspective - some critical questions’ at the Environmental Institute of Australia and New Zealand 2023 Impact Assessment Symposium in Canberra.